Thursday, April 30, 2015

Weeds in Secondary Rough

We just completed pre and post emergent herbicide applications in our secondary rough areas. A different type of post emergent herbicide was used that actually turns the plants white before they go away. It's taking a little longer then normal for this to happen due to the cooler temperatures.





With the severe slopes where most of the secondary rough is located a hand sprayer with hose is used. This makes the process much longer versus being able to ride on the sprayer when applying.

Our next pre and post emergent herbicide application will be to the primary rough. A different group of herbicides will be used in these areas.


Monday, April 27, 2015

Weekly Schedule for April 27-May 3, 2015

Weather and unforeseen conditions can/will change the schedule.

-Pre and Post emergent herbicide application to secondary roughs
-Rock wall repair
-Stump grind at #8 tees
-Bunker sand installation where needed once sand arrives

Monday, April 20, 2015

Weekly Schedule for April 20-26, 2015

Weather and unforeseen conditions can/will change the schedule.

-Pre and Post emergent herbicide application to secondary roughs
-Painting of water cooler houses on the course
-Edge and paint yardage plaques in tees and fairways
-Rock wall repair
-First rough mow of season

Saturday, April 18, 2015

Bunker Sand

We have bunker sand scheduled to be delivered during the week of April 27th to top off any bunkers that need it. Thank you for your patience.


Thursday, April 9, 2015

Porous Pave Installation and Completion Photos

Installation Hole #2

Hole #2 Complete



























Hole #3 Installation
Hole #3 Complete









Hole #7 Installation






















Hole #7 Complete


Monday, April 6, 2015

Weekly Schedule for April 6-12, 2015

Weather and unforeseen conditions can/will change the schedule.

-Topdress and fertilize greens on Monday
-Installation of Porous Pave paths on holes #2, #3 and #7
-Bunker rejuvenation starting with green side bunkers
-Turf Type Tall Fescue overseeding in green surrounds
-Irrigation adjustments


Saturday, April 4, 2015

Sod and Porous Pave Project Update

Been a very busy week here with most of our staff from Mexico returning last Tuesday. All greens were aerified and cleaned off on Monday due to the hard work and efforts of assistant superintendents Carey Bailey and Charles Soper; mechanic Tim Urbanski and staff member Tony Roy. Due to an issue with the travel plans of our associates coming from Mexico they were unable to arrive until Tuesday morning. An amazing job by our staff to do so much work with only 4 people.

Besides a few small clean-up items, the sod work on holes #2 and #10 is complete. There was some left over sod that we were able to install on hole #4 which extends the primary rough up towards the rock wall to the right of the fairway.



The subbase for the paths on holes #2, #3 and #7 was installed Thursday by Evergreen Hardscaping. This Monday the Porous Pave will be installed with use by golfers on Wednesday.

#7 tee walk path

#3 tee walk path